winkens architecture logo



practice profile

residential
bungalow
dormer
two storey
split level
extension

3D animations

progress photos
projects in planning


featured project houses
low energy house
hemp lime house
straw bale house

commercial

information

practice news

home page


Winkens Architecture
Whitestown, Drinagh
Wexford, Ireland
t. +353(0)53 9126605
e.

winkens architecture on Facebook   winkens videos   zeno winkens on Linkedin   zeno's Eco Ark Blog   zeno's tweets  

CERTIFIED PASSIVE BUNGALOW

South/Garden Elevation

ED   Bungalow,   near   Bunclody,   Co. Wexford

This Bungalow is a Certified Passive House 2016.
This is a Split level House with Living room an Kitchen/Diner three steps below rest of House.
The bedroom wing is to the left of main entrance.
The terrace is south facing.
passive house passive house passive house passive house passive house
passive house

Passive House Certification

newest photos on top

line
Photos 11.11.2016   
Bungalow settling nicely.
passive house passive house passive house
line
Photos 08.01.2016   
Skirting and architraves in, Kitchen in Progress.
passive house passive house passive house passive house passive house
line
Photos 22.12.2015   
Timber and tiled floors in.
passive house passive house passive house passive house passive house
line
Photos 27.11.2015   
Heating on and Blower test 2 done.
passive house passive house passive house passive house passive house
line
Photos 06.11.2015   
Ceiling insulation in progress 450mm quilts.
passive house passive house passive house passive house passive house
line
Photos 20.10.2015   
Floor insulation in , underfloor heating pipes in, fast floor screed complete.
passive house passive house passive house passive house passive house
line
Photos 07.10.2015   
Floor insulation nearly finished.
passive house passive house passive house passive house passive house
line
Photos 28.09.2015   
Floor insulation on site and outsided concrete paths finished.
passive house passive house passive house passive house passive house
line
Photos 09.09.2015   
Greenbuild doorblower testing day with loads of smoke.
passive house passive house passive house passive house passive house
line
Photos 06.08.2015   
Window fitting finished airtighness taping in final stages, Wincon test to see if there are any leakage.
passive house passive house passive house passive house passive house
line
Photos 30.07.2015   
Windows arrived, fitting started. Aluclad windows charcoal outside, cream inside.
passive house passive house passive house passive house passive house
line

click thumbnail to see full photo
click right on pic for next pic - click left on pic for previous pic

line
Photos 17.07.2015   
Insulating Window cill and Head.
passive house passive house passive house passive house passive house
line
Photos 14.07.2015   
MHRV ducting installation in progress. Suspended ceiling as well.
passive house passive house passive house passive house passive house
line
Photos 02.07.2015   
Electrics chasing finished. Airtightness taping to begin.
passive house passive house passive house passive house passive house
line
Photos 15.06.2015   
Views from drive way. Getting ready for base coat of plaster outside.
passive house passive house passive house passive house passive house
line
Photos 05.06.2015   
Slating completed, Black PVC Facia cladding in progress.
passive house passive house passive house passive house passive house
line
Photos 27.05.2015   
Slating in progress, cill brackets too. True Windows ordered.
passive house passive house passive house passive house passive house
line
Photos 20.05.2015   
Slating in progress, cill brackets too.
passive house passive house passive house passive house passive house
line
Photos 14.05.2015   
Roof membrance on ready for slates.
passive house passive house passive house passive house passive house
line
Photos 29.04.2015   
Roof trusses nearing completion.
passive house passive house passive house passive house passive house
line
Photos 24.04.2015   
Roof trusses over half way.
passive house passive house passive house passive house passive house
line
Photos 17.04.2015   
Roof trusses starting.
passive house passive house passive house passive house passive house
line
Photos 10.04.2015   
Interior blockwork nearly completed.
passive house passive house passive house passive house passive house
line
Photos 27.03.2015   
Interior blockwork started.
passive house passive house passive house passive house passive house
line
Photos 16.03.2015   
Nearly all exterior blockwork done.
passive house passive house passive house passive house passive house
line
Photos 10.03.2015   
Block work in full swing
passive house passive house passive house passive house passive house
line
Photos 27.02.2015   
Slab down block work started
passive house passive house passive house passive house passive house
line
Photos 18.02.2015   
Weather ok, radon barrior down.
passive house passive house passive house passive house passive house
line
Photos 12.02.2015   First batch of photos.
Setting out and rising walls.
passive house passive house passive house passive house passive house
line

click thumbnail to see full photo
click right on pic for next pic - click left on pic for previous pic

line
This site and the contents thereof © 2017  winkens architecture